Introduction
|
Preliminary Considerations
|
Dispute Review Board
|
Modifications to A201-2007 for DRB
|
Mini-Trial
|
Mini-Trial Supplemental Specifications
|
Arbitration
|
Chapter 11 OWNERS' AMENDING THE AIA A232-2009: GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, CONSTRUCTION MANAGER AS ADVISER EDITION Mark B. Carter
|
Introduction
|
Supplementary Conditions Generally
|
Article 1—General Provisions
|
Article 2—Owner
|
Article 3—Contractor
|
Article 4—Architect and Construction Manager
|
Article 5—Subcontractors
|
Article 6—Construction by Owner or by Other Contractors
|
Article 7—Changes in the Work
|
Article 8—Time
|
Article 9—Payments and Completion
|
Article 10—Protection of Persons and Property
|
Article 11—Insurance and Bonds
|
Article 12—Uncovering and Correction of Work
|
Article 13—Miscellaneous Provisions
|
Article 14—Termination or Suspension of the Contract
|
Article 15—Claims and Disputes
|
Final Considerations
|
Chapter 12 OWNERS' AMENDING CONSENSUSDOCS 200 (2017 EDITION): STANDARD AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND CONSTRUCTOR Douglas L. Tabeling
|
Introduction
|
Article 1—Agreement
|
Article 2—General Provisions
|
Article 3—Constructor's Responsibilities
|
Article 4—Owner's Responsibilities
|
Article 5—Subcontracts
|
Article 6—Time
|
Article 7—Price
|
Article 8—Changes
|
Article 9—Payment
|
Article 10—Indemnity, Insurance, Waivers, and Bonds
|
Article 11—Suspension, Notice to Cure, and Termination
|
Article 12—Dispute Mitigation and Resolution
|
Article 13—Miscellaneous
|
Article 14—Contract Documents
|
Chapter 13 OWNERS' AMENDING EJCDC C-700 (2013 EDITION): STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT Stephen M. Reams
|
Introduction
|
Supplementary Conditions
|
Article 1—Definitions
|
Article 2—Preliminary Matters
|
Article 3—Documents: Intent, Requirements, Reuse
|
Article 4—Commencement and Progress of the Work
|
Article 5—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions
|
Article 6—Bonds and Insurance
|
Article 7—Contractor's Responsibilities
|
Article 8—Other Work at the Site
|
Article 9—Owner's Responsibilities
|
Article 10—Engineer's Status During Construction
|
Article 11—Amending the Contract Documents; Changes in the Work
|
Article 12—Claims
|
Article 13—Cost of the Work; Allowances; Unit Price Work
|
Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work
|
Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period
|
Article 16—Suspension of Work and Termination
|
Article 17—Final Resolution of Disputes
|
PART IV OWNERS’ AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH DESIGN BUILDERS
|
Chapter 14 OWNERS' AMENDING AIA A141-2004: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN-BUILDER S. Gregory Joy, Joseph J. Dinardo, and Kirk D. Johnston
|
Introduction
|
Article 1—The Design-Build Documents
|
Article 2—The Work of the Design-Build Contract
|
Article 3—Date of Commencement and Substantial Completion
|
Article 4—Contract Sum
|
Article 5—Payments
|
Article 6—Dispute Resolution
|
Article 7—Miscellaneous Provisions
|
Article 8—Enumeration of the Design-Build Documents
|
Exhibit A
|
Article A.1
|
Article A.2—Owner
|
Article A.3—Design-Builder
|
Article A.4—Dispute Resolution
|
Article A.7—Changes in the Work
|
Article A.8—Time
|
Article A.9—Payments and Completion
|
Article A.10—Protection of Persons and Property
|
Article A.11—Insurance and Bonds
|
Article A.13—Miscellaneous Provisions
|
Article A.14—Termination or Suspension of the Contract
|
Final Considerations
|
Chapter 15 OWNERS' AMENDING AIA A141-2014: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN-BUILDER S. Gregory Joy, Joseph J. Dinardo, and Kirk D. Johnston
|
Introduction
|
Article 1—General Provisions
|
Article 2—Compensation and Progress Payments
|
Article 3—General Requirements of the Work of the Design-Build Contract
|
Article 4—Work Prior to Execution of the Design-Build Amendment
|
Article 5—Work Following Execution of the Design-Build Amendment
|
Article 6—Changes in the Work
|
Article 7—Owner's Responsibilities
|
Article 8—Time
|
Article 9—Payment Applications and Project Completion
|
Article 10—Protection of Persons and Property
|
Article 11—Uncovering and Correction of Work
|
Article 12—Copyrights and Licenses
|
Article 13—Termination or Suspension
|
Article 14—Claims and Dispute Resolution
|
Article 15—Miscellaneous Provisions
|
Exhibit A—Design-Build Amendment
|
Article A.1—Contract Sum
|
Article A.2—Contract Time
|
Article A.3—Information upon Which Amendment Is Based
|
Article A.4—Design-Builder's Personnel, Contractors and Suppliers
|
Cost of the Work
|
Exhibit B—Insurance and Bonds
|
Exhibit C—Sustainable Projects
|
Final Considerations
|
Chapter 16 OWNERS' AMENDING CONSENSUSDOCS 410 (2017 EDITION) AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND DESIGN-BUILDER (COST OF WORK PLUS FEE WITH GMP) Stephen M. Reams
|
Introduction
|
Article 2—General Provisions
|
Article 3— Design-Builder's Responsibilities
|
Article 4—Owner's Responsibilities
|
Article 5—Subcontracts
|
Article 6—Time
|
Article 7—Payment
|
Article 8—Cost of the Work
|
Article 9—Changes in the Work
|
Article 10— Payment for Construction Phase Services
|
Article 11—Indemnity, Insurance, and Bonds
|
Article 12—Suspension, Notice to Cure, and Termination
|
Article 14—Miscellaneous Provisions
|
|
PART V CONTRACTORS' AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH OWNERS
|
Chapter 17 CONTRACTORS' AMENDING AIA A101-2017: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR WHERE THE BASIS OF PAYMENT IS A STIPULATED SUM Joseph J. Dinardo
|
Introduction
|
Article 1—The Contract Documents
|
Article 2—The Work of This Contract
|
Article 3—Date of Commencement and Substantial Completion
|
Article 4—Contract Sum
|
Article 5—Payments
|
Article 6—Dispute Resolution
|
Article 7—Termination or Suspension
|
Article 8—Miscellaneous Provisions
|
Article 9—Enumeration of Contract Documents
|
Article 10—Insurance and Bonds
|
Chapter 18 CONTRACTORS' AMENDING AIA A102-2007: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR WHERE THE BASIS OF PAYMENT IS THE COST OF THE WORK PLUS A FEE WITH A GUARANTEED MAXIMUM PRICE Joseph C. Staak
|
Introduction
|
Article 1—The Contract Documents
|
Article 2—The Work of This Contract
|
Article 3—Relationship of the Parties
|
Article 4—Date of Commencement and Substantial Completion
|
Article 5—Contract Sum
|
Article 6—Changes in the Work
|
Article 7—Costs to Be Reimbursed
|
Article 8—Costs Not to Be Reimbursed
|
Article 10—Subcontracts and Other Agreements
|
Article 11—Accounting Records
|
Article 12—Payments
|
Article 13—Dispute Resolution
|
Article 15—Miscellaneous Provisions
|
Article 16—Enumeration of Contract Documents
|
Chapter 19 CONTRACTORS' AMENDING AIA A107-2007: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR A PROJECT OF LIMITED SCOPE Joseph C. Staak
|
Introduction
|
Article 1—The Work of This Contract
|
Article 2—Date of Commencement and Substantial Completion
|
Article 3—Contract Sum
|
Article 4—Payments
|
Article 5—Dispute Resolution
|
Article 6—Enumeration of Contract Documents
|
Article 7—General Provisions
|
Article 8—Owner
|
Article 9—Contractor
|
Article 10—Architect
|
Article 12—Construction by Owner or by Separate Contractors
|
Article 13—Changes in the Work
|
Article 14—Time
|
Article 15—Payments and Completion
|
Article 16—Protection of Persons and Property
|
Article 17—Insurance and Bonds
|
Article 18—Correction of Work
|
Article 19—Miscellaneous Provisions
|
Article 20—Termination of the Contract
|
Article 21—Claims and Disputes
|
Chapter 20 CONTRACTORS' AMENDING AIA A132-2009: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR, CONSTRUCTION MANAGER AS ADVISOR EDITION Joseph C. Staak, Joseph J. Dinardo, and S. Gregory Joy
|
Introduction
|
Article 1—The Contract Documents
|
Article 2—The Work of This Contract
|
Article 3—Date of Commencement and Substantial Completion
|
Article 4—Contract Sum
|
Article 5—Payments
|
Article 6—Dispute Resolution
|
Article 7—Termination or Suspension
|
Article 8—Miscellaneous Provisions
|
Article 9—Enumeration of Contract Documents
|
Article 10—Insurance and Bonds
|
Chapter 21 CONTRACTORS' AMENDING AIA A201-2017: GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION David C. King
|
Introduction
|
Article 1—General Provisions
|
Article 2—Owner
|
Article 3—Contractor
|
Article 4—Architect
|
Article 5—Subcontractors
|
Article 6—Construction by Owner or by Separate Contractors
|
Article 7—Changes in the Work
|
Article 8—Time
|
Article 9—Payments and Completion
|
Article 10—Protection of Persons and Property
|
Article 11—Insurance and Bonds
|
Article 12—Uncovering and Correction of the Work
|
Article 13—Miscellaneous Provisions
|
Article 14—Termination or Suspension of the Contract
|
Article 15—Claims and Disputes
|
Chapter 22 CONTRACTORS' AMENDING AIA A232-2009: GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, CONSTRUCTION MANAGER AS ADVISER EDITION Mark B. Carter
|
Introduction
|
Article 1—General Provisions
|
Article 2—Owner
|
Article 3—Contractor
|
Article 4—Architect and the Construction Manager
|
Article 5—Subcontractors
|
Article 6—Construction by Owner or by Other Contractors
|
Article 7—Changes in the Work
|
Article 8—Time
|
Article 9—Payments and Completion
|
Article 10—Protection of Persons and Property
|
Article 11—Insurance and Bonds
|
Article 12—Uncovering and Correction of Work
|
Article 13—Miscellaneous Provisions
|
Article 14—Termination or Suspension of the Contract
|
Article 15—Claims and Disputes
|
Chapter 23 CONTRACTORS' AMENDING CONSENSUSDOCS 200 (2017 EDITION): STANDARD AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND CONSTRUCTOR Douglas L. Tabeling
|
Introduction
|
Article 1—Agreement
|
Article 2—General Provisions
|
Article 3—Constructor's Responsibilities
|
Article 4—Owner's Responsibilities
|
Article 5—Subcontracts
|
Article 6—Time
|
Article 8—Changes
|
Article 9—Payment
|
Article 10—Indemnity, Insurance, and Bonds
|
Article 11—Suspension, Notice to Cure, and Termination
|
Article 12—Dispute Mitigation and Resolution
|
Article 13—Miscellaneous
|
Article 14—Contract Documents
|
Chapter 24 CONTRACTORS' AMENDING EJCDC C-700 (2013 EDITION): STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT Stephen M. Reams
|
Introduction
|
Article 1—Definitions
|
Article 2—Preliminary Matters
|
Article 3—Documents: Intent, Requirements, Reuse
|
Article 4—Commencement and Progress of Work
|
Article 5—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions
|
Article 6—Bonds and Insurance
|
Article 7—Contractor's Responsibilities
|
Article 8—Other Work at the Site
|
Article 9—Owner's Responsibilities
|
Article 10—Engineer's Status During Construction
|
Article 11—Amending the Contract Documents; Changes in the Work
|
Article 12—Claims
|
Article 13— Cost of the Work; Allowances; Unit Price Work
|
Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work
|
Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period
|
Article 16—Suspension of Work and Termination
|
Article 17—Final Resolution of Disputes
|
Article 18—Miscellaneous
|
PART VI CONTRACTORS' AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH SUBCONTRACTORS
|
Chapter 25 CONTRACTORS' AMENDING AIA A401-2017: STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR Eugene J. Heady
|
Introduction
|
Article 1—The Subcontract Documents
|
Article 2—Mutual Rights and Responsibilities
|
Article 3—Contractor
|
Article 4—Subcontractor
|
Article 5—Changes in the Work
|
Article 6—Claims and Disputes
|
Article 7—Termination, Suspension, or Assignment of the Subcontract
|
Article 8—The Work of This Subcontract
|
Article 9—Date of Commencement and Substantial Completion
|
Article 10—Subcontract Sum
|
Article 11—Payments
|
Article 12—Insurance and Bonds
|
Article 13—Temporary Facilities, Services, Equipment and Working Conditions
|
Article 14— Miscellaneous Provisions
|
Article 15—Enumeration of Subcontract Documents
|
Conclusion
|
Chapter 26 CONTRACTORS' AMENDING CONSENSUSDOCS 750 (2017 EDITION): STANDARD AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Douglas L. Tabeling and Jonathan R. Mayo
|
Introduction
|
Article 1—Agreement
|
Article 2—Scope of Work
|
Article 3—Subcontractor's Responsibilities
|
Article 4—Constructor's Responsibilities
|
Article 5—Progress Schedule
|
Article 6—Subcontract Amount
|
Article 7—Changes
|
Article 8—Payment
|
Article 9—Indemnity, Insurance, and Bonds
|
Article 10—Suspension, Notice to Cure, and Termination
|
Article 11—Dispute Mitigation and Resolution
|
Article 12—Miscellaneous
|
Article 13—Subcontract Documents
|
Chapter 27 CONTRACTORS' AMENDING CONSENSUSDOCS 751 (2017 EDITION): STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Douglas L. Tabeling and Jonathan R. Mayo
|
Introduction
|
Identifying the Parties and the Project
|
Article 1—Obligations
|
Article 2—Subcontract Work
|
Article 3—Subcontract Amount
|
Article 4—Exhibits
|
Article 5—Ethics
|
Article 6—Safety
|
Article 7—Warranties
|
Article 8—Time
|
Article 9—Change Orders
|
Article 10—Payment
|
Article 11—Indemnity
|
Article 12—Insurance
|
Article 13—Bonds
|
Article 14—Limited Mutual Waiver of Consequential Damages
|
Article 16—Notice to Cure and Termination
|
Article 17—Dispute Mitigation and Resolution
|
Article 18—Miscellaneous
|
|
PART VII ARCHITECTS' AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH OWNERS
|
Chapter 28 DESIGN-BUILDERS' AMENDING AIA A141-2004: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN-BUILDER S. Gregory Joy and Joseph J. Dinardo
|
Introduction
|
Article 1—The Design-Build Documents
|
Article 2—The Work of the Design-Build Contract
|
Article 3—Date of Commencement and Substantial Completion
|
Article 4—Contract Sum
|
Article 5—Payments
|
Article 6—Dispute Resolution
|
Article 7—Miscellaneous Provisions
|
Article 8—Enumeration of the Design-Build Documents
|
Exhibit A
|
Article A.1
|
Article A.2—Owner
|
Article A.3—Design-Builder
|
Article A.4—Dispute Resolution
|
Article A.5—Award of Contracts
|
Article A.6—Construction by Owner or by Separate Contractors
|
Article A.7—Changes in the Work
|
Article A.8—Progress and Completion
|
Article A.9—Payments and Completion
|
Article A.11—Insurance and Bonds
|
Article A.12—Uncovering and Correction of Work
|
Article A.13—Miscellaneous Provisions
|
Article A.14—Termination or Suspension of the Contract
|
Final Considerations
|
Chapter 29 DESIGN-BUILDERS' AMENDING CONSENSUSDOCS 410 (2017 EDITION) AGREEMENT AND GENERAL CONDITIONS BETWEEN OWNER AND DESIGN-BUILDER (COST OF WORK PLUS FEE WITH GMP) Stephen M. Reams
|
Introduction
|
Article 2—General Provisions
|
Article 3—Design-Builder's Responsibilities
|
Article 4—Owner's Responsibilities
|
Article 5—Subcontracts
|
Article 6—Time
|
Article 7—Payment
|
Article 8—Cost of the Work
|
Article 9—Changes in the Work
|
Article 10—Payment for Construction Phase Services
|
Article 11—Indemnity, Insurance, and Bonds
|
Article 12—Suspension, Notice to Cure, and Termination
|
PART VIII DESIGN-BUILDERS’ AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH DESIGN PROFESSIONALS
|
Chapter 30 DESIGN-BUILDERS' AMENDING CONSENSUSDOCS 420 (2017 EDITION) AGREEMENT BETWEEN DESIGN-BUILDER AND DESIGN PROFESSIONAL Stephen M. Reams
|
Introduction
|
Article 2—General Provisions
|
Article 3—Design Professional's Responsibilities
|
Article 4—Design-Builder's Responsibilities
|
Article 5—Schedule
|
Article 6—Design Professional's Compensation and Payments
|
Article 7—Indemnity and Insurance
|
Article 8—Termination
|
Article 9—Dispute Mitigation and Resolution
|
Article 10—Miscellaneous
|
PART IX ARCHITECTS’ AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH OWNERS
|
Chapter 31 ARCHITECTS' AMENDING AIA B101-2007: STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT AND STANDARD FORM OF ARCHITECT'S SERVICES David A. Roberts
|
Introduction
|
Article 1—Initial Information
|
Article 2—Architect's Responsibilities
|
Article 3—Scope of Architect's Basic Services
|
Article 4—Additional Services
|
Article 5—Owner's Responsibilities
|
Article 6—Cost of the Work
|
Article 7—Copyrights and Licenses
|
Article 8—Claims and Disputes
|
Article 9—Termination or Suspension
|
Article 10—Miscellaneous Provisions
|
Article 11—Compensation
|
Article 13—Scope of the Agreement
|
Exhibit A's Article 1—Project Information
|
Exhibit A's Article 2—Project Team
|
PART X DESIGN-PROFESSIONALS’ AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH DESIGN-BUILDERS
|
Chapter 32 DESIGN PROFESSIONALS' AMENDING CONSENSUSDOCS 420 (2017 EDITION) AGREEMENT BETWEEN DESIGN-BUILDER AND DESIGN PROFESSIONAL Stephen M. Reams
|
Introduction
|
Article 2—General Provisions
|
Article 3—Design Professional's Responsibilities
|
Article 4—Design-Builder's Responsibilities
|
Article 5—Schedule
|
Article 6—Design Professional's Compensation and Payments
|
Article 7—Indemnity and Insurance
|
Article 8—Termination
|
Article 10—Miscellaneous
|
|
PART XI SUBCONTRACTORS' AMENDMENTS AND ALTERNATIVE CLAUSES FOR AGREEMENTS WITH CONTRACTORS
|
Chapter 33 SUBCONTRACTORS' AMENDING AIA A401-2017: STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR Eugene J. Heady
|
Introduction
|
Article 1—The Subcontract Documents
|
Article 2—Mutual Rights and Responsibilities
|
Article 3—Contractor
|
Article 4—Subcontractor
|
Article 5—Changes in the Work
|
Article 6—Claims and Disputes
|
Article 7—Termination, Suspension, or Assignment of the Subcontract
|
Article 8—The Work of This Subcontract
|
Article 9—Date of Commencement and Substantial Completion
|
Article 10—Subcontract Sum
|
Article 11—Payments
|
Article 12—Insurance and Bonds
|
Article 13—Temporary Facilities, Services, Equipment and Working Conditions
|
Article 14— Miscellaneous Provisions
|
Article 15— Enumeration of Subcontract Documents
|
Conclusion
|
Chapter 34 SUBCONTRACTORS' AMENDING CONSENSUSDOCS 750 (2017 EDITION): STANDARD AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Douglas L. Tabeling and Jonathan R. Mayo
|
Introduction
|
Article 1—Agreement
|
Article 2—Scope of Work
|
Article 3—Subcontractor's Responsibilities
|
Article 4—Constructor's Responsibilities
|
Article 5—Progress Schedule
|
Article 6—Subcontract Amount
|
Article 7—Changes
|
Article 8—Payment
|
Article 9—Indemnity, Insurance, and Bonds
|
Article 10—Suspension, Notice to Cure, and Termination
|
Article 11—Dispute Mitigation and Resolution
|
Article 13—Subcontract Documents
|
Chapter 35 SUBCONTRACTORS' AMENDING CONSENSUSDOCS 751 (2017 EDITION): STANDARD SHORT FORM AGREEMENT BETWEEN CONSTRUCTOR AND SUBCONTRACTOR Douglas L. Tabeling Jonathan R. Mayo
|
Introduction
|
Identifying the Parties and the Project
|
Article 1—Obligations
|
Article 2—Subcontract Work
|
Article 3—Subcontract Amount
|
Article 4—Exhibits
|
Article 5—Ethics
|
Article 6—Safety
|
Article 7—Warranties
|
Article 8—Time
|
Article 9—Change Orders
|
Article 10—Payment
|
Article 11—Indemnity
|
Article 12—Insurance
|
Article 13—Bonds
|
Article 14—Limited Mutual Waiver of Consequential Damages
|
Article 15—Risk of Loss
|
Article 16—Notice to Cure and Termination
|
Article 17—Dispute Mitigation and Resolution
|
Article 18—Miscellaneous
|
PART XII AMENDMENTS AND ALTERNATIVE CLAUSES ADDRESSING INSURANCE ISSUES
|
Chapter 36 MODIFYING INSURANCE PROVISIONS IN STANDARD FORM CONSTRUCTION CONTRACTS Kirk D. Johnston and Daniel F. McLennon
|
PART I MODIFYING AIA CONTRACT FORMS
|
Introduction—Construction Insurance
|
Owners' Amending AIA Prime Contract A101-2017: Standard Form of Agreement Between Owner and Contractor Based on a Stipulated Sum; A102-2017: Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment Is the Cost of the Work Plus a Fee With a Guaranteed Maximum Price; and A103-2017: Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment Is the Cost of the Work Plus a Fee Without a Guaranteed Maximum Price
|
Owners' Amending AIA Prime Contract A132-2009: Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition
|
Owners' Amending AIA A201-2017: General Conditions of the Contract for Construction
|
Owners' Amending AIA A101-2017, A102-2017, and A103-2017 Exhibit A, Insurance and Bonds
|
Owners' Amending AIA A201-2007: General Conditions of the Contract for Construction; and A232-2009: General Conditions of the Contract for Construction, Construction Manager as Adviser Edition
|
Owners' Amending AIA A104-2017 (Formerly A107-2007): Standard Abbreviated Form of Agreement Between Owner and Contractor
|
Owners' Amending AIA A141-2014: Agreement Between Owner and Design-Builder
|
Contractors' Amending AIA Prime Contract A101-2017: Standard Form of Agreement Between Owner and Contractor Based on a Stipulated Sum; A102-2017: Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment Is the Cost of the Work Plus a Fee With a Guaranteed Maximum Price; and A103-2017: Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment Is the Cost of the Work Plus a Fee Without a Guaranteed Maximum Price
|
Contractors' Amending AIA Prime Contract A132-2009: Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition
|
Contractors' Amending AIA A201-2017: General Conditions of the Contract for Construction
|
Contractors' Amending AIA A101-2017, A102-2017, and A103-2017 Exhibit A, Insurance and Bonds
|
Contractors' Amending AIA A232-2009: General Conditions of the Contract for Construction, Construction Manager as Adviser Edition
|
Contractors' Amending AIA A104-2017 (Formerly A107-2007): Standard Abbreviated Form of Agreement Between Owner and Contractor
|
Contractors' Amending AIA Subcontract AIA A401-2017: Standard Form of Agreement Between Contractor and Subcontractor
|
Subcontractors' Amending AIA Subcontract AIA A401-2017: Standard Form of Agreement Between Contractor and Subcontractor
|
PART II MODIFYING CONSENSUSDOCS CONTRACT FORMS
|
Owners' Amending ConsensusDocs 200: Agreement and General Conditions Between Owner and Constructor (Lump Sum)
|
Contractors' Amending ConsensusDocs 200: Agreement and General Conditions Between Owner and Constructor (Lump Sum)
|
Contractors' Amending ConsensusDocs 750: Agreement Between Constructor and Subcontractor
|
Subcontractors' Amending ConsensusDocs 750: Agreement Between Constructor and Subcontractor
|
PART III MODIFYING EJCDC CONTRACT FORMS
|
Owners' Amending EJCDC Standard General Conditions EJCDC C-700 (2013 Edition): Standard General Conditions of the Construction Contract
|
Table of Cases
|
Index
|